Photo - Leonid Misevich
39194

Leonid Misevich

Belarus, Mogilev Region
Market: Power Engineering
Stage of the project: Prototype or product is ready

Date of last change: 10.06.2019
Min investment
$  300.000
Total required
$ 2.000.000
Rating
equalizer 138 из 1000
help
Calculated and estimated occupancy of the project (more about ratings)
My rating
1
2
3
4
5
6
7
8
9
10
Average rating:

Idea

Construction of mini-hydro
Republic of Belarus, Mogilev Region, Bykhov District, Kosichi Village
Coordinates: latitude (53.667695), longitude (30.178663)

The estimated cost of the investment project:
The volume of investments, $ - 2 000 000;
Estimated revenue per year, $ - 600 000;
The amount of investment required to start the development of the site (documentation, including the design and estimate documentation, preparatory work), $ - 300,000;
Payback period - 7 years.

Current Status

The estimated cost of the investment project:
The volume of investments, $ - 2 000 000;
Estimated revenue per year, $ - 600 000;
The amount of investment required to start the development of the site (documentation, including the design and estimate documentation, preparatory work), $ - 300,000;
Payback period - 7 years.
1. Construction of the facility
The area, hectares - for the construction of the object a previously existing site.
Availability of engineering communications
- estimated power is 1 MW.
- there are electricity supply networks in the territory
There is no central sewage system.
To the site there is an entrance.

The presence on the land of buildings and structures (encumbrances) to be demolished - no

Market

Republic of Belarus

Problem or Opportunity

Restoration of a previously existing hydroelectric station

Solution (product or service)

The product of this project is electricity, which will be supplied to the network at a “green” tariff.

Competitors

no

Advantages or differentiators

There are no competitors in this project, but you need to hurry, because the project is interesting because construction does not need to start from scratch. There is an earth dam, electrical network, which significantly reduces the initial cost of construction.

Finance

Estimated revenue per year, $ - 600 000;
Payback period - 7 years.

Business model

This is a renewable small hydropower business.

Money will be spent on

Investments are needed for the full cycle of power plant rehabilitation (design work, equipment purchase, installation and commissioning).

Offer for investor

95%

Team or Management

Risks

The only risk of this project is the abolition of the "green" tariff for renewable sources, this may increase the payback period.

Incubation/Acceleration programs accomplishment

The project is in the stage of study and investor search

Photos

Photo 1 - Leonid Misevich
5,00
1
2
3
4
5
1 voice
Log In/register
arrow_back
EN
more_horiz
close
visibility58
star0
Add to favorites
Delete from favorites
share
close
thumb_up0
Like
Unlike
Idea
Current Status
Market
Problem or Opportunity
Solution (product or service)
Competitors
Advantages or differentiators
Finance
Invested in previous rounds, $
Business model
Money will be spent on
Offer for investor
Team or Management
Mentors & Advisors
Lead investor
Risks
Incubation/Acceleration programs accomplishment
Won the competition and other awards
Invention/Patent
Photos
Product Video
Website address